Auction sales history

WBS4Y9C54JAA85325

2018 Bmw M4

Vehicle condition

Title TX - ORIGINAL
Loss Collision
Condition Stationary
Keys Yes
Primary damage Front End
Secondary damage Not specified
Airbags Intact
VIN WBS4Y9C54JAA85325

Vehicle specs

Odometer 65923 mi / actual
Est. retail value 36024$
Est. repair cost Not specified
Vehicle type Automobile
Body type Coupe
Color Black
Engine 3.0 L 6 cyl
Fuel Gasoline
Transmission Automatic
Drive Rear Wheel Drive

2018 Bmw M4

Sale status
Ended
17350$ Final bid

Lot information

#45938613
Auction IAAI
Country United States
Sale branch Tx - Houston-north
Seller Insurance company
Auction date 2026-09-24
Ended at 14:30:00

Lot sales history

Auction date Final bid
2026-09-24 14:30:00 17350$

Similar vehicles

IAAI 2026-10-12
19850$
Auction sale of the 2017 Bmw M4, vin: WBS3R9C52HK709391, lot number: 45906983
Gasoline / 3.0 L / 6 cyl / Rear wheel drive
Odometer
94032 mi
Damage
Undercarriage
Condition
Engine starts
IAAI 2026-10-12
23250$
Auction sale of the 2019 Bmw M5 Competition, vin: WBSJF0C54KB285764, lot number: 45908803
Gasoline / 4.4 L / 8 cyl / All wheel drive
Odometer
60588 mi
Damage
Right side
Condition
Stationary
IAAI 2026-10-05
34750$
Auction sale of the 2019 Bmw M5, vin: WBSJF0C58KB284746, lot number: 45702172
Gasoline / 4.4 L / 8 cyl / All wheel drive
Odometer
34554 mi
Damage
Front end
Condition
Run and drive
IAAI 2026-10-05
2500$
Auction sale of the 2017 Bmw 3 Series 330i, vin: WBA8B9G3XHNU53491, lot number: 45969638
Gasoline / 2.0 L / 4 cyl / Rear wheel drive
Odometer
156850 mi
Damage
Repossession
Condition
Run and drive
IAAI 2026-10-05 Auction sale of the 2018 Bmw X5 Xdrive35i, vin: 5UXKR0C50J0X88574, lot number: 46082824
Gasoline / 3.0 L / 6 cyl / All wheel drive
Odometer
71802 mi
Damage
Front end
Condition
Run and drive
IAAI 2026-10-12
27100$
Auction sale of the 2019 Bmw M850i Xdrive, vin: WBAFY4C5XKBX39057, lot number: 45931232
Gasoline / 4.4 L / 8 cyl / All wheel drive
Odometer
42433 mi
Damage
Rear
Condition
Run and drive

Vehicle auctions sales history by VIN: WBS4Y9C54JAA85325

Vehicle salvage auctions play a key role in the secondary market, providing buyers with unique opportunities to purchase vehicles at lower prices than in traditional markets. However, every car has its own history, and this history is revealed through a unique VIN code that tracks all aspects of its life - from production to the moment of sale at auction. Let's consider the sales history of a car with VIN WBS4Y9C54JAA85325.

2018 Bmw M4 3.0 L 6 cyl black, Auction IAAI

The main highlights of the auction lot 45938613, listed for sale at the IAAI salvage auction:

Also on this page you can find out all the detailed information about 2018 BMW M4: auction sales history; vehicle photos; all hidden information about auction lot; full technical characteristics and specification of the vehicle. You can find the similar lots at the IAAI auction of BMW make by this link.